Admiralty Resources

Global Resource Mining for the China Market

Translate:

  • Home
  • Corporate Overview
    • Corporate Governance
    • Board of Directors
    • Capital Structure
    • Corporate Directory
    • Company Structure
    • Corporate Responsibility
    • Right to Receive Documents
  • Projects
    • Admiralty Minerals
    • Pyke Hill
  • Investor Centre
    • ASX Announcements
    • Media
    • Reports
    • Presentations
    • Events
    • Corporate
  • Gallery
  • Blog
  • Contact Us

Latest News

Drilling to Commence in Soberana

board meeting

Rocterra Limitada, a local Chilean mining Company has been undertaking infrastructure and construction activities in preparation of the forthcoming commercialisation of the mine. Formal lodgements have been made for the surface rights permits for the mine, with the rights granted by Hot Chili Limited. There is currently an outstanding permit for the land held by Campañía Minera del Pacífico (CMP). The Company has filed for a Court Ruling over the surface rights after considerable time invested in seeking to obtain an amicable agreement with CMP. The Company is confident that there will be a favourable ruling in short order.

Read more

Mariposa

In January 2013 Admiralty announced its latest Mineral Resource Statement for Mariposa. The Mariposa resource update is based on the results obtained from the 3,040m diamond drilling campaign completed in 2012 and the additional chemical and metallurgical analysis performed during 2012 on the following variables: Total Iron (FeT), Magnetic Iron (FeMag) Content and Davis Tube Weight Recovery (RDTT).

A Competent Person Report is included in the ASX announcement of 25 January 2015.

11th April 2018, ADY is pleased to announce that it has received unanimous approval of the DIA for the Mariposa Project by the Chilean authorities. This is a significant achievement for ADY and step forward in commercial exploitation of the Mariposa Project and puts the company in a position to commence mining works on the site.

Admiralty engaged China Anhui Ma Steel Engineering & Technology Co.,
Ltd. Updated the PFS in September 2018:
• Resource of 66.6Mt at an average of 35.6% total iron (FeT) using a cut-off
grade of 25% FeT.
• 17-year Life of Mine (LOM) estimated based on current resources
• Production rate of 2 million tonnes per annum, the 71.78kt/an iron ore
concentrates with TFe grade of 68% will be produced.

Read more

Pyke Hill – Western Australia

Here are the latest projections for our Pyke Hill mine in WA.

Read more

Investment Opportunity

Use the form below to get in touch with us about investing in Admiralty Resources Global Mining Operations.

Sidebar

  • This field is for validation purposes and should be left unchanged.

Latest Posts

  • board meeting Drilling to Commence in Soberana
  • Mariposa
  • Pyke Hill – Western Australia

Most Popular

  • Pyke Hill – Western Australia
  • Mariposa
  • board meeting Drilling to Commence in Soberana

Topics

ady

admiralty resources
© Copyright 2025 Admiralty Resources. All Rights Reserved.
  • Privacy Policy
  • Terms & Conditions
Call us:
P: (02) 9283 6502
Business Address:
Suite 109, Level 1
150 Pacific Highway
North Sydney NSW 2060
Postal Address:
Suite 109, Level 1
150 Pacific Highway
North Sydney NSW 2060
© Copyright 2025 Admiralty Resources. All Rights Reserved.
  • Privacy Policy
  • Terms & Conditions